Objectives

PARS FARAGAM Qeshm Engineering & Construction Co.

•   Safety & Loss Control Dep.

1.  The Cause and Effect of Loss
2.  Management Control of Loss
3.  Planned Inspection
4.  Groups Meetings
5.  Personal Protective Equipment (PPE) & Internal Rules
6.  Effective Safety Promotion
7.  Occupational Health & Safety
8.  Accident /Incident Investigation
9.  Hazardus Study
10. Medical & ...

 

•   Quality Assurance & Quality Control Department.

1.  Quality Management
2.  Quality Assurance
3.  Quality Audits
4.  Quality Improvement
5.  Procedures
6.  Tests & Inspections
7.  Records & Filing(Documentation)

 

•   Marketing, Cost Estimation & Projects Evaluation Dep.

1. Marketing
2. Proposal
3. Scope Of Work
4. Contract Terms & Conditions
5. Cost Estimation
6. Project Execution Procedures
7. Pre- Qualification
8. Preparation And Submission Of Proposal

 

•   Administration & Financial Dep.

1.  Personal
2.  General Affairs
3.  Transportation
4.  General Warehouse
5.  Accounting
6.  Financing
7.  Camp & Catering
8.  Training
9.  Instructure

 

•   Engineering (By J.V)

1.  Engineering Planning
2.  Basic Engineering
3.  Detail Engineering
4.  Purchase Order
5.  Technical Review Of Proposals
6.  Specification/ Standards/…
7.  Construction Documents (Drawing, Procedure, …)
8.  Material Requisition From Warehouse.
9.  Material Traceability & Control
10. Interface Meetings

 

•   Procurement

1.  Vendors List
2.  Inquiry To Vendors
3.  Analysis of Quotation
4.  Purchase Order for Equipment and Materials
5.  Procurement
6.  Inspection and Expediting Vendor Supplies
7.  Transportation & Traffic Controls

 

•   Construction & Load- Out

1.  Detailed Construction Planning
2.  Organization and Man-power
3.  Execution Procedure & Method Statements
4.  Qualification / Tests/…
5.  Mobilization And Equipment
6.  Field Administration
7.  Safety Control
8.  Quality Control
9.  Subcontractor
10. Internal & External Meeting
11. Project Progress & Control
12. Maintenance And Preservation
13. Warehouse
14. Transportation/ Load Out and Lifting

 

•   Sea Transportation & Heavy Lifting & Installation (By J.V)

1.  Planning
2.  Organization
3.  Transportation Procedure
4.  Barge Study
5.  Sea Fastening
6.  Lifting Procedure
7.  Crane Study
8.  Rigging
9.  Interconnecting
10. Interface Meetings

 

•   Pre-commissioning & Commissioning

1.  Detailed Planning
2.  Procedures
3.  Operational Manuals
4.  Organization and Man-power
5.  Tests and Checks
6.  Loops-control
7.  Equipment Running
8.  System Release
9.  Start-up

 

•   Cost Control Dep.

1.  Project Financial Scheduling
2.  Plan for Invoicing
3.  Project Budgetary Plan